top of page

FOR GENERAL CONTRACTORS

Multiple full kitchens in a day. No guesswork.

The back end of the job is where schedules break. Kit Switch takes unit interiors off that critical path: quality is set in the shop, the punch list is near-empty, and your team spends its time on the scopes that actually need supervision. Coupled with other prefabrication on the job, the schedule savings compound. The product is designed for construction: standardized enough to bring efficiencies but flexible enough to adapt to jobsite realities.

TWO WAYS TO BRING US ON

As a design-build partner Starting in DD

We lock in design and spec early, move through submittals fast, and eliminate the RFIs that normally surface during construction.

As an all-in-one supplier
Starting after permitting

Also workable, as long as the permitted specifications align with our kits or carry some flexibility. Send us the drawings and we'll tell you straight away.

DESIGN DEVELOPMENT

PERMITTING

2-4 hours

INSTALL

Install time per 5-8LF kitchen by a
2-person crew, including all cabinets, countertop, backsplash, fixtures, and appliances.

 

2-4x faster

MEP ROUGH-INS

Kit Switch panels can host plumbing lines and electrical conduits on top of existing drywall rather than through it. No penetrations through studs, no patching, and no surprises behind walls. 

8-12 weeks

LEAD TIME

Once shop drawings and specification package are approved, production lead times are 8-12 weeks depending on the factory partner selected.
 

HOW WE WORK WITH GENERAL CONTRACTORS

01

JUST IN TIME
DELIVERY

02

LEVEL
AND SET

03

FIELD

SUPPORT

Kits arrive labeled by unit number, sequenced to your schedule. No staging chaos.

Once the cleat is mounted level, the kit assembles smoothly. No additional shimming needed. All components are pre-cut and ready for install.

The field support team helps coordinate MEP roughs with your subcontractors and trains installers on day 1.

2 carpenters install a Kit-Kitchen within a day.

A TRADE NETWORK THAT ALREADY ENJOYS THE SYSTEM

Not only does the Kit Switch process support the project manager's scheduling and budget needs, but the carpenters and MEP subs in our network have positive reports about our product and process. Several have asked to be on the next one. They are ready to fold into your bid, and if you would rather keep your own preferred subs, we train them on the system at no cost to you.
 "Kit Switch made sure everything was ready. There were no missing pieces. We scheduled just-in-time deliveries. Each kit was labeled with a unit number. There was no guesswork."

Henry Baca

PROJECT MANAGER, NOVIN CONSTRUCTION

A DISTRIBUTED SUPPLY CHAIN

We are not a single factory with backlog. Kits are built by a distributed network of independent fabricators, so no one plant's queue sets your delivery date, and we can stand up capacity in a new geography without waiting on a new building.

Active fabrication partners in production in Washington, California, Texas, and New York

Vetted additional partners qualified and ready to activate in Montana, Illinois, Georgia, and New Jersey

38 years average time in business across our active fabrication partners

ACTIVE IN PRODUCTION

VETTED, READY TO ACTIVATE

Frequently Asked Questions

  • 01
  • 02
  • 03
  • 04
  • 05
  • 06
  • 07

Bring Kit Switch onto your next jobsite.

WHERE WE FIT BEST:

In-place renovations on a tight schedule

New construction already leveraging prefabrication methods

Projects of at least 20 units

Adaptive reuse such as hotel and motel conversions

bottom of page